Module 2: Mobilisation Costing
Costing Intelligence Suite · dynes-insights.com
Module 2 takes you from bid award to go-live. It maps the work, costs, and risks involved in mobilising a contract, giving you a clear picture of what it will take to deliver on the commitments you've made.

You can work through this module in three ways, depending on where you're starting from. Choose the option that fits your situation.
How would you like to start?
Option 01
Import from Module 1
You've completed a Module 1 costing assessment and have the handover file ready to upload. Your opportunity context, rate deck, strategic lens, and open challenge flags will be carried forward automatically.
What you'll need: the JSON handover file exported from Module 1.
Import Module 1 file
Option 02
Manual entry
You don't have a Module 1 file, but you're ready to work through the full mobilisation costing. You'll enter your opportunity context and rate structure before moving into the mobilisation workplan.
What you'll need: contract details, role rates, and an outline of the mobilisation activities you're planning.
Start with manual entry
Option 03
Cost indication only
You want a cost estimate for mobilisation without a full costing exercise. You'll enter your activity list and costs, and the tool will produce a total with a breakdown by workstream and cost type.
This option produces a cost indication, not a costed bid position. You can upgrade to a full assessment at any point.
Start cost indication
01 Opportunity Context
Work through each field carefully; the information you enter here shapes the cost analysis and the AI challenge review in Stage 3.
The name or reference you're using internally for this contract.
The organisation awarding the contract.
Total contract value as awarded or expected.
£
The agreed or anticipated go-live date.
Time available between contract award and go-live.
For example: in-house team, partner-led, or blended model.
Select the strategic intent that best describes this mobilisation approach. In Stage 2 you can compare multiple scenarios each with a different route.
The assumptions your cost model depends on. Be specific: vague assumptions produce unreliable cost estimates.
02 Rate and Role Setup
Set up the role tiers you'll be drawing on during mobilisation. You don't need to use all six tiers; activate only the ones that apply.
Core Rate Deck
Active Tier Label Default role type Hourly rate (£)
Mobilisation-Specific Additions
Use these fields if your mobilisation draws on roles outside your standard rate structure. Enter a label and rate for each.
03 Staffing and TUPE
This section captures the additional staffing required for mobilisation and any Transfer of Undertakings (Protection of Employment) obligations that apply to this contract. TUPE in particular carries cost implications that are often incompletely known at mobilisation planning stage; this section is designed to capture what's known, flag what isn't, and ensure nothing is overlooked when the cost picture is reviewed.
Additional Staffing Requirements
Record any fixed-term or interim roles required specifically for the mobilisation period. These are roles brought in to support mobilisation activity, not the ongoing delivery team.
Role title Type Tier / rate Rate (£/hr) Duration Start point People Est. cost Notes
Recruitment Costs
Capture any recruitment costs associated with the additional staffing above. In practice, recruitment costs are often apportioned across multiple projects; record the figure you're attributing to this mobilisation and note the basis below.
The cost attributed to this contract. May be full or apportioned.
£
TUPE Obligations
Staff Transfer
Your best current estimate. Note uncertainty in comments if not confirmed.
The organisation from which staff are transferring.
Planned or required consultation period, including start date if known.
Enter a figure if known, or flag as unquantified.
£
Harmonisation Costs
Harmonisation costs arise where transferring staff's terms and conditions differ from your standard structure and require adjustment. These are often unknown or unconfirmed at mobilisation planning stage.
Pension Obligations
Pension obligations for transferring staff can represent a significant and complex liability. The position is frequently unconfirmed at mobilisation planning stage; record what's known and flag what isn't.
TUPE cost total: £0 confirmed + 0 unquantified items
04 Mobilisation Work Breakdown
This is the core of your mobilisation costing. Add one row per activity. Each row captures the internal labour, sub-contractor, and direct non-labour costs associated with that activity; you can use all three cost types in a single row, or just the ones that apply. Group activities by workstream using the dropdown on each row. The running totals update as you build the list.
Total mobilisation cost
£0
One-off enablement
£0
Recoverable
£0
Contingent
£0
Activity Workstream Role tier Hours Sub-contractor (£) Non-labour (£) Classification Notes